During the years 2017-2018 we have designed 7 solar power plants for the total capacity of 103 MWp, among which:

• Ganska SES (19.1 MWp)
• Irshanska SES (33 MWp)
• BSP1&2 (28 MWp)
• KSES (23 MWp) and others.

Image

During the years 2017-2018 we have designed 7 solar power plants for the total capacity of 103 MWp, among which:

• Ganska SES (19.1 MWp)
• Irshanska SES (33 MWp)
• BSP1&2 (28 MWp)
• KSES (23 MWp)
and others.

Image

Kamyanets-Podilsky biomass power plant, Ukraine

Construction of Kamyanets-Podilskyi Biomass Power Plant (CHP) with total capacity of 45 MW is the biggest energy efficiency project in Kamyanets-Podilskyi.

The CHP of this kind is the first in Ukraine, third in Europe and fifth in the world. It is equipped with a turbine with ORC (Organic Rankine Cycle) module, two solid-fueled boilers of 10 and 5 MW capacity, and 2 gas-fueled boilers of 12 MW capacity each.

The gas-fueled boilers are used for the peak loads, when the temperature is 10° C below zero.

Through the use of CHP, Kamyanets-Podilskyi administration expects to reduce natural gas consumption up to 65%.

The CHP construction was financed by the World Bank.

Ganska solar power plant, Zhytomyr region, Ukraine

Ganska SES is the first industrial solar power plant in Zhytomyr region with the peak capacity of 19.1 MW.

Danish company Better Energy A/S together with NEFCO invested 17 mln euro in construction of Ganska SES.

The solar power plant is located on the territory of Velyki Nizgirtsi village council (outside the populated area), Berdychiv district, Zhytomyr region.

It is equipped with 24 complex transformer substations, 408 inverters and 58 752 photovoltaic modules.

Ganska SES will operate in complex with ecofarm.

By the way, the solar power plant is named after famous Evelina Ganska, wife of Honore de Balzac. The famous couple was married in St. Barbara's Church in Berdychiv.

Kamyanets-Podilsky biomass power plant, Ukraine

Construction of Kamyanets-Podilskyi Biomass Power Plant (CHP) with total capacity of 45 MW is the biggest energy efficiency project in Kamyanets-Podilskyi.

The CHP of this kind is the first in Ukraine, third in Europe and fifth in the world. It is equipped with a turbine with ORC (Organic Rankine Cycle) module, two solid-fueled boilers of 10 and 5 MW capacity, and 2 gas-fueled boilers of 12 MW capacity each.

The gas-fueled boilers are used for the peak loads, when the temperature is 10° C below zero.

Through the use of CHP, Kamyanets-Podilskyi administration expects to reduce natural gas consumption up to 65%.

The CHP construction was financed by the World Bank.

Ganska solar power plant, Zhytomyr region, Ukraine

Ganska SES is the first industrial solar power plant in Zhytomyr region with the peak capacity of 19.1 MW.

Danish company Better Energy A/S together with NEFCO invested 17 mln euro in construction of Ganska SES.

The solar power plant is located on the territory of Velyki Nizgirtsi village council (outside the populated area), Berdychiv district, Zhytomyr region.

It is equipped with 24 complex transformer substations, 408 inverters and 58 752 photovoltaic modules.

Ganska SES will operate in complex with ecofarm.

By the way, the solar power plant is named after famous Evelina Ganska, wife of Honore de Balzac. The famous couple was married in St. Barbara's Church in Berdychiv.

how we earn money

Image
Image
Image
Image

staff

From 2 employees in 2015 we have grown to 38 permanent and 98 temporary (season) in 2018!

We are moving rapidly, and if you are able to keep our pace, if you are creative, problemsolving and outside-the-box thinking - welcome to our team!

Image

From 2 employees in 2015 we have grown to 38 permanent and 98 temporary (season) in 2018!

We are moving rapidly, and if you are able to keep our pace, if you are creative, problemsolving and outside-the-box thinking - welcome to our team!

Image

strategy 2025

Image

Balancing System — the key problem for Ukraine when switching to RE.

State Enterprise «Ukrenergo» is engaged in negotiations with foreign partners and investors about construction of first 200 MW energy storage as the main component of the Balancing System of Ukraine

TeslaEnergo is developing projects in order to join the market:

• Balancing System — quick start turbine powered generation of 20-25 MW capacity
• Energy Storage — 35-40 MW
• Waste to Energy — public tendering 2 cities
• Biomass PC — 27 MW
• CHP — 13 MW
• Biogas — 1MW

Image

Balancing System — the key problem for Ukraine when switching to RE.

State Enterprise «Ukrenergo» is engaged in negotiations with foreign partners and investors about construction of first 200 MW energy storage as the main component of the Balancing System of Ukraine

TeslaEnergo is developing projects in order to join the market:

• Balancing System — quick start turbine powered generation of 20-25 MW capacity
• Energy Storage — 35-40 MW
• Waste to Energy — public tendering 2 cities
• Biomass PC — 27 MW
• CHP — 13 MW
• Biogas — 1MW

partnership package

Image

Invest to shares of TeslaEnergo Be a part of Successful Energy Story of Ukraine

owners

Oleg Gramotenko

CEO & Owner of TeslaEnergo

Image

CEO & owner of Estonia Energy Invest OU
Over 15 years in financial development

Leonid Kriger

Co-owner of TeslaEnergo

Image

Energoholding «Kriger» is number one company in Ukraine
for the production and sale of «green» biomass energy
Over 20 years experience in biomass

Oleg Gramotenko

CEO & Owner of TeslaEnergo

Image

CEO & owner of Estonia Energy Invest OU. Over 15 years in financial development

Leonid Kriger

Co-owner of TeslaEnergo

Image

Energoholding «Kriger» is number one company in Ukraine for the production and sale of «green» biomass energy. Over 20 years experience in biomass

welcome page